Our qualified professional engineers have extensive experience in the design and permitting of water and wastewater storage, treatment and disposal facilities in United States. Our engineers have current knowledge of the permitting process and interface routinely with the Federal, State and local agencies. These include Building, Fire and HazMat Departments. The familiarity of our personnel with the permitting systems in various states allows us to provide our clients with efficient, cost-effective, and timely permitting services including negotiation on variances.
This service is tailored for high-tech FABs, plating shops, PCB and Disc manufacturers, Dairy plants, and hotels and resorts where startup date is crucial. During the design phase, ease of operation and serviceability of the equipment and components are considered.

Waste Water Neutralization Calculations_U S

1. Caustic Addition – (pH is too low and must be raised)
Instructions: Enter values in blue boxes. Spreadsheet calculates values in yellow boxes
Inputs
Calculations

gmp

WW Flow Rate, Qww =

gal/day

Moles/L of OH needed =

moles/L

Incoming pH, pHin =

NaOH rate needed =

moles/day

Desired pH, pHout =

Caustic solution rate =

lb/day

Caustic sol’n % NaOH =

Caustic solution rate =

gal/day

Caustic sol’n density, ρ =

lb/gal

Daily cost of caustic =

$/day

Caustic solution cost =

$/lb

Wastewater Neutralization Calculations – U.S. units
1. Caustic Addition – (pH is too low and must be raised)
Instructions: Enter values in blue boxes. Spreadsheet calculates values in yellow boxes
Inputs

gmp

WW Flow Rate, Qww =

gal/day

Incoming pH, pHin =

Desired pH, pHout =

Caustic sol’n % NaOH =

Caustic sol’n density, ρ =

lb/gal

Caustic solution cost =

$/lb

Calculations

Moles/L of OH needed =

moles/L

NaOH rate needed =

moles/day

Caustic solution rate =

lb/day

Caustic solution rate =

gal/day

Daily cost of caustic =

$/day

Wastewater Neutralization Calculations – U.S. units
2. Acid Addition – (pH is too high and must be lowered)
Instructions: Enter values in blue boxes. Spreadsheet calculates values in yellow boxes
Inputs
Calculations

gmp

WW Flow Rate, Qww =

gal/day

Moles/L of H+ needed =

moles/L

Incoming pH, pHin =

H2SO4 rate needed =

moles/day

Desired pH, pHout =

Acid solution rate =

lb/day

Acid sol’n % H2SO4 =

Acid solution rate =

gal/day

Acid sol’n density, ρ =

lb/gal

Daily cost of acid =

$/day

Acid solution cost =

$/lb

Wastewater Neutralization Calculations – U.S. units
2. Acid Addition – (pH is too high and must be lowered)
Instructions: Enter values in blue boxes. Spreadsheet calculates values in yellow boxes
Inputs

gmp

WW Flow Rate, Qww =

gal/day

Incoming pH, pHin =

Desired pH, pHout =

Acid sol’n % H2SO4 =

Acid sol’n density, ρ =

lb/gal

Acid solution cost =

$/lb

Calculations

Moles/L of H+ needed =

moles/L

H2SO4 rate needed =

moles/day

Acid solution rate =

lb/day

Acid solution rate =

gal/day

Daily cost of acid =

$/day